OUR SERVICES

Consulting business concept. Text and ic
Cleanroom Consulting

 

Phase I of every clean room project begins with a Consultative Review by Cleanetics' Engineering Team, the first step in understanding our clients historical processes, or Means & Methods, a way to identify any noticeable gaps or inefficiencies in the flow of production that could be mitigated or improved prior to the onset of the Clean Room Design.

​

Most importantly, Cleanetics helps our clients to formally specify their Performance Criteria (environmental) and Operational Standards (SOPs & GMPs) to ensure that each clean room project has a clear direction from kick-off to certification.

Inspector are testing dust inside the op
Cleanroom Environmental Monitoring

 

The primary function of every Design-Build Clean Room project is to engineer and construct an ISO-CLASSIFIED environment that either adheres to a specific Code of the Federal Regulations (CFR) or a set of criteria that meets the internal standards set forth by the end user.

​

And, the only way to VALIDATE that one's room is in COMPLIANCE with those standards is through a routine ISO-Certification program.

​

Cleanetics' Environmental Monitoring & Certification Program provides both periodic ISO-Testing & Sampling (non-viable and viable) as well as Real-Time Remote Monitoring & Data-Logging.

Architectural blueprints and blueprint r
Cleanroom Design/Build

 

Phase II of a clean room project--the Design-Build phase--brings together Cleanetics' team of Subject Matter Experts (SME)--Architects & Engineers--to develop the Construction Documents.

 

When completion deadlines are vital--or, when an accelerated Construction Schedule is required--Cleanetics will select and procure the long-lead equipment (HVAC) early stages of the engineering process to shorten the timeline of construction.

​

Cleanetics manages and constructs our projects to completion using our Certified Clean Room Technicians and experienced, licensed MEP contractors, sourcing vendors who are local and familiar to our clients.

Outside2965_edited.jpg
Cleanroom Sterile Casework Manufacturing

 

For fifteen years, Cleanetics has designed and manufactured a high-performance line of Sterile Casework for the Hospital Pharmacy sector (USP <797>). Using our proprietary Bio-Gard surface finish and durable (high-capacity) mechanical interlocking system, we've custom built STERILE PASS-THROUGHS for some of the nation's foremost Healthcare networks.

​

In 2019, in response to USP <800>, Cleanetics launched its new ISO-5 Air Shower Purging Pass-Through as a buffer between Hazardous environments and non-classified zones--and recently, in response to the Covid-19 crisis, we've introduced our innovative Intubation Isolation Shroud, a portable, fully-contained negative pressure barrier to protect healthcare providers from the potential contagion of the intubating process.